x

Progress of your installation

Here is what will happen after we receive your order:
  • We will contact you within 2 working days to agree on the date of the appointment on site in order to finalize the details of your installation* and create your file (connection request) with CREOS,
  • Once the administrative details have been settled, we agree on the date of installation of your charger,
  • The lead time between order confirmation and installation is on average 4-6 weeks.

*Installation appointment : Maximum distance between the bollard and the electrical panel 10m
Charger protection and load shedding imposed by CREOS
To be integrated in the electrical panel
1 drilling concrete wall then test and commissioning.

Power Boost

530 € excl. VAT

Three-phase | Carlo Gavazzi energy meter EM340
  • Intelligently redistributes your home's energy
  • For DIN-rail support
  • Backlit LCD display (3x8 digits) with integrated touch keypad
Power Boost technical information & installation

Power Boost

Facility

Maximum distance between the bollard and the electrical panel 10mTo be integrated in the electrical panel

Compatible

Compatible with Copper SB and Pulsar Plus

Power

Real-time adjustment of charging power

Power Boost

Weight : 24g
Dimensions : 6x9x5cm
Digital input (for tariff management)
DC current measurement : up to 65AAC
Supply voltages : 208VAC to 400VAC
Integrated counter
Easy connection or bad detection of current direction
Power supply : autonomous

Contact us & buy Power Boost.
borne de recharge véhicule électrique luxembourg
Copyright (c) PARKING ENERGY SERVICES SARL

sales@parkingenergyservices.com
+352 28 99 96 74
1, route de Luxembourg, Kockelscheuer, L-1899, Luxembourg

RCS Luxembourg: B234510
TVA: LU31650016